The weeks after possession decide how smoothly your interiors go. Here's the checklist we walk through with clients who've just received the keys to a new Bengaluru apartment.
Part 1: Inspect the flat at handover
Before any interior work starts, check the flat carefully and send the builder a written list of defects ("snags"). Fixing them is much harder once wardrobes and cabinets cover the walls.
- Walls and ceilings: cracks, damp patches and uneven plaster — especially on walls shared with bathrooms.
- Floor tiles: tap them gently; a hollow sound means poor bonding. Check for chips and uneven joints.
- Plumbing: run every tap and shower, flush every toilet, and look for leaks under sinks and at the ceiling below bathrooms.
- Electrical: test every switch and socket, and check that the distribution board is labelled.
- Doors and windows: smooth opening and locking, intact glass, proper seals — important before the monsoon.
- Balcony and utility: drainage slope and waterproofing.
Part 2: Measure and plan before you buy anything
- Get an accurate site measurement of every room, including ceiling height, beams, columns and window positions.
- Decide furniture positions first — bed, wardrobe, TV, sofa, dining table. Everything else follows from this.
- Mark electrical changes: TV wall points, bedside switches, AC points, study-table sockets, kitchen appliance points, and points for lighting inside wardrobes and the false ceiling.
- Mark plumbing points: washing machine inlet and drain, water purifier, dishwasher, and any change to the kitchen sink position.
- Plan AC piping so copper pipes and drains can be concealed in walls or the false ceiling.
- Decide the false ceiling and lighting plan before painting, because ceilings and wiring go in first.
Part 3: Follow the right order of work
Doing things in the wrong order is the most common reason interiors run late or need rework. This is the sequence we follow:
- Civil changes, if any (breaking or adding walls, tiling changes)
- Electrical and plumbing changes, AC piping
- False ceiling and cove lighting framework
- Wall putty and the first coat of paint
- Carpentry installation — kitchen, wardrobes, TV unit, beds
- Light fixtures, hardware and countertops
- Final paint touch-ups
- Deep cleaning and handover
Part 4: Check your apartment association's rules
Almost every gated community in Bengaluru has rules for interior work. Before you start, find out:
- Permitted working hours and days (many don't allow noisy work on Sundays)
- Whether you need to submit a work request or pay a refundable deposit
- Service lift usage and protection for common areas
- Where workers can park and how debris must be removed
- Rules about changes to the exterior, balcony grills or utility areas
Part 5: Set a budget with priorities
Split your interiors into must-haves before moving in (usually the kitchen, wardrobes and basic lighting) and things that can wait (TV unit, false ceiling in every room, décor). Ask for an itemised quote so you can move items between phases without redesigning everything. Read our materials guide to understand where spending more on materials actually matters.
Part 6: Keep these documents safe
- Builder's handover and snag-list correspondence
- Electrical and plumbing layouts from the builder, if available
- Your interior design drawings and final quote
- Warranty cards for hardware and appliances
Getting possession soon?
We plan complete home interiors around your possession date — measurement, design, an itemised quote, and installation by our own carpenters. If you're starting with just the kitchen and wardrobes, see our modular kitchen and wardrobe pages.
Frequently asked questions
When should I start planning interiors for a new flat?
Ideally 1 to 2 months before possession. That gives time to finalise designs and materials so work can begin as soon as you get the keys and the association's permission.
Do I need permission from the apartment association for interior work?
Most Bengaluru apartment associations require you to inform them, follow fixed work hours, use the service lift and sometimes pay a refundable deposit. Check the rules before work starts.
Should painting be done before or after the carpentry?
Do the first coat of paint after the false ceiling and before the carpentry is installed, then a final touch-up coat once all furniture is fitted. This avoids damage to the finished paint.
Can I move into the flat while interiors are going on?
It's possible if the work is done in phases, but dust, noise and materials make it uncomfortable. Most families move in after the main carpentry and ceiling work is finished.